March 21, 2024 1:48 pm

An interesting video that shows the construction process of ENEIDA, a development built with industrialized wood in 10 months.

  • Video: WES + FINSA
  • Production: JuNu!
  • February 2024
  • Duration: 5’37”

An interesting video that shows the construction process of ENEIDA, a development of 16 single-family homes in Puig den Ros, Llucmajor in Mallorca, built with an industrialized wooden structure in 10 months.

It’s an innovative collaboration between AEDEAS Homes, Estudio Lamela, Wood Engineering Systems (WES), and Financiera Maderesa S.A. (FINSA).

In Estudio Lamela, we favor industrialized construction and the use of wood and ecological and sustainable materials.

Industrialized construction makes it possible to reduce deadlines and costs while optimizing processes. Using a modular prefabricated system also improves the quality of finishes.

An interesting video that shows the construction process of ENEIDA, a development built with industrialized wood in 10 months.
subir